Received awards:
Anhui Province Municipal Quality Engineering Award
Project Introduction:
The west extension project of Mingzhu Road in Hefei City consists of municipal road and bridge engineering. The width of the ground lane on the north side of Mingzhu Avenue is 67.25 meters, and the width on the south side of Mingzhu Avenue is 63.75 meters. The total length of the overpass bridge on Mingzhu Avenue is about 305.08 meters, with a height of 30-40 meters and a road width of 28.60 meters. The main bridge is a variable cross-section prestressed concrete continuous beam, which is constructed using integral support cast-in-place construction. However, the construction of reinforced concrete crash barriers is difficult. To ensure the practicality and aesthetics of the bridge, the project department adopts new technologies such as high durability concrete technology, high-strength steel bar application technology, bonded prestressing technology, plain concrete formwork technology, and information technology application technology.

Scan the code and follow now
There are new developments every day
Scan the QR code on WeChat to follow
Editor's online answer
Zhong'an Huali Construction Group Co., Ltd. © 2020 All Rights Reserved. Anhui ICP Registration No. 05014330-1