Strictly implement the "seven in place": Zhong'an Huali Rail Transit Project Department resumes work with a "hard core" approach
author: 轨道交通项目部 许善奎
Release time: 2020-02-26
views: 12189

According to the spirit of the "Notice on Orderly Resumption of Work and Business of Enterprises in the City (No. 10)" issued by Hefei City, Zhong'an Huali Construction Group Hefei Metro Line 4 Section 2 Project Department, under the overall deployment of the group company, adheres to the joint efforts of epidemic prevention and control and resumption of work and production, focusing on the specific requirements of "seven to one" and "one filing", taking multiple measures to do a good job in resumption of work reporting and material mobilization, and carrying out resumption of work and production in an orderly manner according to the plan.

1582704553782595.jpg

All management personnel of the project department solemnly participated in the flag raising ceremony

The prevention and control mechanism is in place - in accordance with the requirements of the superior's instructions on epidemic prevention and control, the project department has established an epidemic prevention and control leadership group and an epidemic prevention and control emergency rescue group. Comrade Zhang Hedong, the executive deputy commander, serves as the leader of the epidemic prevention and control emergency rescue group, and Comrade Wan Yan Xiangyang, the project leader, and other comrades serve as deputy leaders. And prepare the "Resumption of Production Plan", "Epidemic Prevention and Control System", and "Emergency Response Plan" in accordance with the requirements of relevant documents, and implement the resumption of production and health and epidemic prevention work.

1582704652852872.jpg

1582704681739381.jpg

Personnel investigation is in place - strict real name management is implemented for employment, and temporary recruitment of casual workers and temporary workers is strictly prohibited. The workers entering the site are all from the Anhui Lujiang team who previously participated in the construction. There are traces of work left at the station. Verify the identity information of personnel entering the site one by one to ensure that workers have zero epidemic areas and zero contact.

1582704732750176.jpg

Identity verification and health information entry of personnel entering the site

1582704791261167.jpg


Apply for access cards for every new worker entering the site

Adequate material reserves - equipped with sufficient disease control supplies such as masks, thermometers, disinfectants, etc. The reserve amount of disinfectant, combined with the scale of each construction site, is used in accordance with the "Daily disinfection method of the resumed enterprises" in the "Technical Guide for the Prevention and Control of COVID-19 in Hefei", to meet the demand of one week. Two thermometers should be reserved at each gate. Masks are included in the management of labor protection equipment, ensuring that each person entering the site has no less than one mask per day and a reserve of no less than one week's use.

1582704877409740.jpg

Special epidemic prevention materials

On site control is in place - on-site management resolutely implements the "Five Ones and One No", that is, full temperature testing of personnel and full registration of entry and exit; Wear all protective equipment and keep the construction site fully enclosed for management; All areas are fully disinfected; Life and work do not gather.

1582704955126617.jpg

Personnel dining strictly follows a one in and one out policy to prevent gatherings

1582704981564236.jpg

Measure personnel's body temperature twice a day

All personnel entering the site must wear masks and take personal protective measures. Only one entrance and exit is open on the construction site, and separate posts are set up 24 hours a day in the construction site and living area (if the construction site is not located together with the office area, separate posts are also set up in the office area). Disinfect and ventilate the construction site, office, living areas, and other personnel activity areas daily to maintain indoor air circulation.

1582705102772150.jpg

Daily disinfection of office and living areas, as well as personnel activity areas

Emergency response in place - the Project Department has prepared an emergency response plan based on the actual situation of the project, and formulated emergency response measures according to the general novel coronavirus pneumonia events and the major and above novel coronavirus pneumonia events.


According to the document [2020] No. 25 on epidemic prevention and control, measures such as temperature measurement, certification, registration, and isolation shall be taken for personnel returning to work in the field. At present, the main sources of personnel planning to resume work mainly include Lujiang County in Hefei City and Shucheng County in Lu'an City.


The epidemic prevention and control work implements a daily reporting system (reporting incidents and reporting safety if there are no incidents) and an emergency reporting system. Report any changes in personnel on the construction site to the supervisory agency in a timely manner (one day in advance for incoming personnel, and on the same day for outgoing personnel).


1582705193853732.jpg

Set up emergency isolation rooms on site

Education disclosure is in place - measures such as posting health and epidemic prevention propaganda advertisements in prominent locations on the construction site and living areas are taken to enhance the prevention and control awareness of on-site personnel, and to consciously do a good job in self-protection. Relevant health and epidemic prevention education should be included in the on-site and daily pre job education at the construction site.

1582705268131493.jpg

Organize and carry out propaganda and education on the knowledge of novel coronavirus infected pneumonia, and the epidemic education disclosure goes deep into every entry unit and every entry personnel.

1582705307522874.jpg

Safety technical briefing for resuming production

1582705332208947.jpg

Safety education briefing for epidemic prevention and control

Safety measures are in place - key personnel are in place, mechanical maintenance and debugging are in place, and hidden danger investigation and rectification are in place; Worker safety education is in place. All key personnel in the project are on duty. The on-site foundation pit has been sealed off, and the construction tasks are clear. All workers entering the site, especially those who have just entered or transferred positions, must undergo safety education, training, and technical disclosure to ensure that they are proficient in safety knowledge that matches their job responsibilities.

1582705437156641.png

Shield tunneling machine, inspection of mechanical, electrical, hydraulic, and slurry systems




【Zhong'an Huali Construction Group Co., Ltd】
Video Number

Scan the code and follow now
There are new developments every day

WeChat Account

Scan the QR code on WeChat to follow
Editor's online answer